国产在线欧美在线日韩专区_午夜亚洲日韩精品一区二区_国产在线视频二去三区夏幕_国产AV无码国产AV毛片_草草视频在线观看最新_人妻 自慰 偷窥 无码_高清少妇中文日本_美女被啪啪到高潮视频免费_免费人妻中文字幕_538在线国产在线

Hello, welcome to Jinan Huawei CNC machinery CO., Ltd

National Advisory Service Hotline

Advanced Search:


Contact us


contact us

Contacts:JI Manager

Unified hotline:400-6587-688

Tel: (86)531-88276988

Fax:(86)531-88276988

Phone number:0086-15269186223

Address: No.18 Tonghua Road ,

Licheng district , Jinan city, 
shandong province, China



technical support

General instructions for pressurized drilling machine

Source: Time:2024-05-04 09:34:04 views:

The general instructions for the pressurized drilling machine are as follows: 1. Before drilling, please confirm that all components are securely fastened. Turn on the machine switch and preheat for a while until normal

The general instructions for the pressurized drilling machine are as follows:

Before drilling, please confirm that all components are securely fastened. Turn on the machine switch (on) and preheat it for a while until it reaches normal operating temperature before starting the actual operation. 2. Connect the suction device and storage tank with an air duct to ensure that the sealing material is attached to the pipeline without being worn off, the interface is tight, and there is no air or oil leakage. 3. Choose the appropriate drill bit size according to actual needs and install it at the appropriate position on the top of the host; At the same time, install the pressure gauge at the end of the exhaust pipe (pay attention to tightening the fastening nut). 4 . Add distilled water to the storage tank until it is full; And connect the short section with a single valve to the quick connector on the other end of the host and close it with the three-way valve on top. During work, close attention should be paid to the changes in the pointers of the inlet and outlet ports to ensure that they are within the middle green zone, indicating that the working pressure range is appropriate. When the pressure is too high, adjust the pressure relief valve or reduce some process steps to reduce the oxygen supply speed. During work, it is strictly prohibited to disassemble instrument parts without inspection before use to avoid accidents. 7 Cleaning methods: Soak in kerosene for a few minutes, then clean and dry with a brush. Do not block the weld seam, which may affect normal use. 8 Pay attention to the direction of the safety cover to prevent the arms or hair of workers from being caught and causing injury. 9. This equipment must be placed steadily before construction! To prevent the mechanical parts from getting stuck or the arms from getting caught by people accidentally! If any abnormal sound is detected during use, stop using immediately for inspection. The above word count is approximately 150 characters. If there are any other requirements or specific usage precautions, they can be described in detail and supplemented. The word count is between 3349728 bytes (6 pages in total) (recommended for reference only)

keys: